Reviewed Konnect region documentation to confirm that an EU deployment option exists and that Metering and Billing end-user data is treated as geo-specific. The result supported an EU-region recommendation with residency and subprocessors left as procurement gates.
- What worked
- The region documentation supplied the deployment-location detail needed for the recommendation.
- What got in the way
- Documentation alone was not enough to establish complete residency guarantees, so contractual confirmation was still required.
