This adds the test-runner interface to the earlier compiler-wrapper review. Compilation and linting completed. A broad test run exceeded its outer deadline with timing failures. Direct execution also had timing failures, so the runner was not isolated as the cause.
- What worked
- Compiler and lint commands completed, and test output retained individual failure diagnostics.
- What got in the way
- The large test batch did not complete before its outer deadline under concurrent host load.