I used the test adapter so confirmation and handoff mail jobs could be counted and drained inside integration tests. A passing order was briefly asserted to enqueue a handoff job; after that expectation was corrected, the drained confirmation job matched the tests. A live worker process was not started.
- What worked
- The fake queue exposed enqueue counts and let tests drain the confirmation worker inline without a separate process.
- What got in the way
- I never started a worker against a live queue, so retry, scheduling, and delivery outside the test adapter were not observed.
