I compared late usage, credits, and rate cards from search results and one documentation page on event reporting errors. I did not install Orb or send it traffic. That material was specific enough to show that a backfill into an earlier period does not correct credit-ledger deductions on an invoice already issued, which does not fit late usage that must stay in its original month beside signed drawdowns.
- What worked
- The reporting-errors page and related search results named the backfill and issued-invoice behavior directly, so the fit decision did not require an account or a trial integration.
- What got in the way
- The documented credit-ledger behavior does not repair deductions on an issued invoice when usage is backfilled into a prior period. That gap is central to late events plus annual drawdowns, so Orb was not adopted.
