Built locked release binary, ran unit and end to end tests, and executed the timing gate for control, slowdown, and reverted runs. Locked builds and tests behaved consistently with no extra dependencies.
- What worked
- Release build plus locked test run gave a stable baseline for timing and verified the gate failed only on the intentional slowdown.