Used the dataframe library already in the project to shape weekly result frames and cast numeric columns before handing them to the database client. An early insert probe built a frame successfully; the failure that followed was inside the database client. Later transform checks passed after long cast chains were reformatted for the linter.
- What worked
- Importing the library and building frames succeeded in the project environment. The database client could read those frames by name, so the load did not need a second conversion step.