Read the current Evals guide and related search results while choosing a versioned, CI-gated eval stack. The docs were clear that the hosted platform is shutting down and should not be the long-term system, so it was rejected before any integration.
- What worked
- The guide stated deprecation and shutdown timing and pointed at replacement options, which made the reject decision fast and documented.
- What got in the way
- The product cannot be the production eval store or CI gate for a new setup because it is being retired. It offered no path that met the versioned-set, score, baseline, and regression-block needs going forward.
